U.S. Orders: (800) 626-2866
U.S. Tech Services: (800) 286-6070

BUNNserve Service Protection Plans

Service Protection Plans are our most comprehensive service programs. Plans must be purchased at the time of equipment purchase and include options for equipment installation, preventive maintenance, water filtration, 24/7/365 troubleshooting support, and all reactive service for 2 years from date of equipment installation.* Coverage can be renewed prior to expiration of the initial coverage term.

* See Reactive Service section below for list of exclusions

Services – Included and Optional

Models Installation Water Filtration Preventive Maintenance Replacement Water Filter Cartridges Reactive Service
2 years parts & labor*
BUNNlink
Drip Coffee & Tea BrewersOptionalOptionalOptional (12 month)OptionalIncludedN/A
Coffee GrindersOptionalN/AOptional (12 month)N/AIncludedN/A
Hot Powdered BeverageOptionalOptional6, 12 & 18 monthOptionalIncludedN/A
NitronOptionalOptional12 monthOptionalIncludedN/A
JuiceOptionalOptional12 monthOptionalIncludedN/A
Ultra NXOptionalN/A12 monthN/AIncludedN/A
RefreshOptionalOptional12 monthOptionalIncludedN/A
CrescendoIncludedOptional6, 12 & 18 monthOptionalIncludedN/A
Sure ImmersionIncludedOptional12 monthOptionalIncludedIncluded
Fast CupIncludedOptionalAs Needed/On CycleOptionalIncludedIncluded
PremiaIncludedOptionalAs Needed/On CycleOptionalIncludedIncluded

* See Reactive Service for exclusions.

Installation

  • Labor, travel and standard installation materials for one site visit to install and calibrate BUNN® Beverage Equipment to customer provided specifications during normal business hours (8:00 AM – 4:30 PM, Monday – Friday).
  • Installation of BUNN or customer provided water filtration. Equipment must be installed with appropriate water filtration in line to mitigate lime scale and mineral build-up in equipment whether purchased from BUNN or provided by the customer.
  • Standard plumbing installation materials include beverage tubing and common plumbing fittings required to connect equipment to appropriate, existing, plumbing utilities that meet local building codes and manufacturer’s installation requirements.
  • Water line connections must be within 6 feet of brewer placement and have available tees or valves for connection. Installers cannot cut or “sweat” copper fittings on water lines.
  • Appropriate electrical cord-set to connect brewer to existing electrical outlet. Outlet must be within 4.5 feet of equipment placement.
  • Includes de-installation of 1 machine for each machine installed. Removed machine(s) will be left on site.
  • If model purchased includes BUNNlink, install and set up of BUNNlink will be done at the time of install, provided network connectivity details are shared with Bunn in advance of installation. If set up is required post installation, then additional costs will apply for the subsequent service call. (See BUNNlink section below for more details).

Failed Installation Attempts

  • All utilities must be in place upon installer’s arrival. A Failed Installation Attempt Fee will be invoiced at Time & Material rates for installations that cannot be completed during the first visit due to lack of site readiness.

Water Filtration

BUNN highly recommends installation of WEQ High Performance Water Filtration specifically engineered for beverage applications to mitigate lime scale formation and undesirable tastes and odor. Repairs required due to scale formation or erosion due to aggressive water are not included in plan coverage.

  • Optional BUNN WEQ High Performance Water Filtration specifically engineered for beverage applications.
    • Reduction of particulates, chlorine/chloramines for improved taste and clarity of water.
    • Scale inhibitor for lime scale and corrosion reduction.
    • Optional replacement cartridges included during PMs

Preventive Maintenance

  • Includes management, labor, travel, PM Parts.
  • Scheduled and dispatched by BUNNserve at appropriate intervals.
  • Includes replacement water filter cartridges if specified.
  • Does not include major descaling.
  • PMs are required to qualify for reactive service coverage if included in packages.

Reactive Service

  • Includes management, labor, travel and replacement parts for service calls for 2 years from the date of equipment installation.
    • Exclusions
      • Does not include failures resulting from operator error, equipment misuse or abuse.
      • Does not include failures resulting from acts of God including, but not limited to floods, lightning, tornado or other acts of nature.
      • Does not include failures resulting from electrical supply fluctuations.
      • Does not include failures resulting from restricted water flow, severe or aggressive water conditions causing excessive lime scale formation or deterioration of machine components.
      • Does not include firewall or connectivity issues for BUNNlink, post initial setup, resulting from location related configuration changes or updates.
  • Service requests must be directed to the BUNNserve Call Center to qualify for coverage.
  • Technical support and service dispatch available 24/7/365 through the BUNNserve Call Center.
  • On-site service coverage hours are during normal business hours (8:00 AM – 4:30 PM, Monday – Friday), excluding Federally observed holidays.
  • Service dispatch is available outside program coverage hours at Time & Material Rates.
  • In no event shall BUNN be liable for any other damage or loss, including, but not limited to, lost profits, lost sales, loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental or consequential damages.
  • BUNN reserves the right to disqualify locations from service coverage due to repeat service visits related to operator error, poor water quality or electrical supply variations. BUNN will notify customers and provide recommendations prior to disqualification.

Purchase Details

  • Paid in Advance – Total cost of plan added to equipment invoice.
  • Protection Plans are non-cancellable, non-refundable, non-transferrable and have no early exit options. Customer is responsible for the total amount due and paid up front.
  • Protection Plans are effective the date of install, running for consecutive months regardless of installation or usage status after initial installation.

Flat Rate Programs are not available for large venues such as airports, stadiums, and arenas; locations that conduct security screenings or have limited or restricted access; remote locations (Zone C), all Alaska and Hawaii locations and locations that are accessible only by boat or air travel or for locations that require overnight lodging to complete services.

BUNNserve services are performed by BUNN Authorized Service Providers or BUNN Factory Representatives. Selection of servicer is at sole discretion of BUNNserve.

Attention

Orders can only be shipped in the United States. Your selected catalog region indicates that you are outside the U.S. Please change your region to North America - U.S. if you wish to check out. For international orders please call us at 1 (217) 529 6601

Your cart is empty
Loading Dock is required to deliver order
×

Upon delivery if there is no commercial loading dock, BUNN will not be able to complete the delivery.

If we have to reattempt the delivery with a liftgate truck, you will be charged for both deliveries at your expense.

Confirm
What is a loading dock?
×

Example of a commercial loading dock

A commercial loading dock is a designated area at a warehouse, distribution center, retail store, or other commercial building where trucks and delivery vehicles load and unload goods. It's typically built at a raised platform height matching truck trailer beds (usually 48-52 inches off the ground) to allow forklifts and pallet jacks to move freight directly between the building and the vehicle.

Okay
Shipping Calculations
×

Calculating Shipping Costs...

Apply Shipping Costs to Order
Browse Equipment
Catalog Region
North America